DIR Ball Screw Series: 10 Models, 16-40 mm Shafts, up to 30.6 kN

Category: Nut-Rotating & Screw-Spline 2026-11-24

DIR is a nut-rotating ball screw with a standard lead and preload type for 16-40 mm shafts. The catalogue table below is the selection source for this series, not a list of interchangeable model numbers.

DIR model coverage

The table covers 10 catalogue rows from 16 to 40 mm shaft diameter and 5 to 12 mm lead. Maximum published Ca is 30.6 kN and maximum C0a is 72.3 kN. Empty cells are fields the catalogue does not publish for that row; they are not zero.

ModelShaft d (mm)Lead (mm)Ball dia dp (mm)Root dia dc (mm)Ca (kN)C0a (kN)Rigidity K (N/µm)
DIR1605-616516.7513.27.413310
DIR2005-620520.7517.28.517.3310
DIR2505-625525.7522.29.722.6490
DIR2510-425102621.6918330
DIR3205-632532.7529.211.130.2620
DIR3206-63263328.414.937.1630
DIR3210-6321033.7526.425.752.2600
DIR3610-6361037.7530.528.863.8710
DIR4010-6401041.7534.729.869.3750
DIR4012-6401241.7534.430.672.3790

Column note: d is nominal shaft diameter, dp is ball centre diameter, dc is root diameter, Ca is dynamic load, C0a is static load, FP is allowable load where published, and K is rigidity. Verify the full model suffix on the drawing.

How to compare DIR models

  • Start with shaft diameter and lead. The same shaft can appear with several leads; lead changes thrust, speed and back-drive behaviour before it changes headline load.
  • Compare Ca and C0a separately. Ca is the dynamic rating for a moving duty cycle; C0a is the static rating and is not an interchangeable dynamic capacity.
  • Check ball circuit and rigidity. More circuits or a larger ball set can raise stiffness, but the nut envelope and running torque also change.
  • Read the suffix. Preload, clearance, flange, return and sealing variants share a base model but not the same envelope or lost motion.
  • For a replacement, measure screw length, shaft ends, nut outer diameter, flange hole pattern and the distance from nut to bearing block.

Checks before an equivalent DIR quote

  • Confirm the complete model code, not only series and shaft diameter. The suffix decides nut, flange, preload or clearance.
  • Confirm screw length, thread start and end, shaft end shape, keyway or thread, and support bearing journal.
  • Confirm accuracy grade and axial clearance or preload class; these change running torque and repeatability.
  • Check nut envelope against the mounting plate, including return cap, lubrication nipple and wiper or seal.
  • Check critical speed for the chosen lead and supported length; a long, large-lead screw can be speed-limited below its load limit.
  • Confirm lubrication, contamination and orientation. A rotating nut or screw-and-spline unit needs a different support and guard arrangement.
  • Send a drawing or clear photos of the existing unit. A catalogue number alone does not define stroke, shaft ends or custom machining.

DIR ball screw FAQ

Does DIR cover every shaft diameter in this table?

The table lists 10 catalogue rows from 16 to 40 mm. It does not cover every custom stroke, shaft end or nut suffix; confirm the full code and drawing for a non-standard build.

How is the DIR model code read?

The first four digits after the series prefix give shaft diameter and lead; the suffix identifies the nut, flange, preload or clearance variant. Two rows with the same diameter can have different envelopes and running behaviour.

What is needed for an equivalent DIR quote?

Send the complete model code, lead, shaft diameter, overall screw length, nut envelope drawing, accuracy grade, preload or clearance class and the mounting interface.

Related knowledge

Cross-reference source: THK SC15 Ball Screw (513C), pages 244-244, checked 2026-11-24. MS Linear is not affiliated with, endorsed by, or sponsored by THK. Model numbers are used for cross-reference only.

Cross-reference source: THK SC15 Ball Screw (513C), pages 244-244, checked 2026-11-24

MS Linear is not affiliated with, endorsed by, or sponsored by THK. Model numbers are used for cross-reference only. Dimensions and ratings are checked against the source catalogue; the drawing and inspection sheet govern the delivered part.

China Factory Direct · Drop-in Compatible Dimensions

Buying Precision Motion Components from China
is Your Best Choice!

Factory-direct quality and worldwide shipping — standard parts leave the factory in 3–10 days, custom strokes and leads in 15–20 days (2–3 weeks). Send your drawing or the original part number and get a quotation within 24 hours.

Drop-in Replacement Factory-Direct Price Global Shipping OEM / Non-Standard Bulk Discounts