01One rail is the datum, the other follows it
Rails supplied as a pair are not identical. One is the master, marked with a datum line or an MA stamp, and ground to the tighter of the two tolerances. The other is the subsidiary rail and is aligned to the master once the master is fixed.
Whether the pair is numbered matters at installation: rails marked 001 and 002 belong together, and blocks are matched to the rail they were measured on. Swapping them between machines or between positions is the most common way a pair that was fine in the factory arrives out of tolerance on site.
Practical rule. Fix the rail that has the machined shoulder behind it. If neither rail has a shoulder, fix the one that is easier to measure against a straight edge, and treat the second rail as the one that gets adjusted.
02Four ways to hold a rail against its datum
| Method | How it works | Where it is used |
|---|---|---|
| Clamp plates | A plate bolted to the bed presses the rail side against the shoulder. | General machine beds; cheap and removable. |
| Push screws | Set screws in the bed push the rail sideways into contact. | Retrofit and repair work where the bed has no shoulder. |
| Taper wedges | A wedge pair converts bolt torque into side pressure with fine control. | Long rails and heavy beds where clamp plates would be too many. |
| Dowel pins | Pins locate the rail directly in reamed holes. | Repeatable production, where the rail is removed and refitted. |
The method decides how much side force the rail sees before the bolts are torqued. A rail pushed hard by clamps and then torqued can bow between the bolts; a rail that is only finger-seated can move when the machine warms up.
03The sequence
Clean the mounting face
Remove burrs, chips, paint and old sealant. Wipe the rail and the datum edge until a white cloth stays clean. A chip under a rail is a 20 µm error spread over 200 mm.
Place the master rail
Set it against the shoulder without forcing it. If it rocks, the face is not flat; stop and check before going further.
Seat it sideways
Clamp or push until the rail is in contact along its whole length. Check contact by feel at the ends, not only in the middle.
Torque from the centre out
Two passes: half torque, then full torque, both starting at the middle bolt and working outwards. This lets the rail relax towards its ends instead of being stretched from one end.
Align the second rail
Use a dial indicator on a bridge across two carriages, or drive the table along the master rail and read the gap at the second rail. Adjust, clamp, re-check, then torque in the same pattern.
Mount the blocks diagonally
Set the table on the blocks, push each block against its datum, and tighten in a 1-4-2-3 diagonal order. Tightening one side first pulls the table out of square and loads the blocks against each other.
Re-check the running force
Push the table through the full stroke by hand, both directions. The force should be smooth, similar in both directions, and free of local peaks at the joint or at the ends.
04Aligning the second rail without a side push
Many beds have no shoulder behind the second rail, and no room for push screws. Four methods work in that situation:
- Indicator bridge. Two carriages on the master rail carry a bridge with a dial indicator reading the side of the second rail. Move the bridge along the stroke and adjust until the reading stays inside the parallelism tolerance for the grade.
- Gauge blocks. Set the distance between the rails with blocks at several stations, then torque and re-check. Slower, but usable where a bridge will not fit.
- Drive the table. Fit the blocks and the table, then push the table along the master rail and watch the second rail move or flex. Adjust until the table runs without side loading.
- Datum copying. Install the master rail and its blocks first, use the table as a transfer reference, and set the second rail to the position the table actually wants.
Whichever method is used, the check is the same: parallelism along the stroke, not at one station. A rail that is right at both ends and bowed in the middle will run tight in the middle of the stroke.
05What a bad installation looks like afterwards
| Symptom | Likely cause |
|---|---|
| Tight spot in the middle of the stroke | Second rail bowed, or the bed is not flat under the rail centre. |
| Click once per pass | Rail joint misaligned, or a block crossing a joint that was not staggered. |
| One rail runs hot | Blocks preloaded against each other by a non-parallel rail pair. |
| Position error grows along the stroke | Rail not seated against the datum, moving under load as the machine warms. |
| Wiper wear on one side only | Side load from misalignment, pushing the block against one raceway. |
Most of these are diagnosed by pulling the table by hand with the drive disconnected. The force signature along the stroke points to the station where the problem is, which is faster than re-measuring the whole bed.
06Questions we get
Do I need a machined shoulder for both rails?
One datum shoulder is enough when the second rail can be aligned with an indicator. Two shoulders suit a bed machined in one setup, but are harder to correct later.
How tight should the rail bolts be?
Use the catalogue torque for the bolt size and series, reached in two passes from the centre outwards. Over-torque distorts the rail; under-torque lets it creep.
Can I install the rail without a torque wrench?
Not if the machine has to hold a precision grade. The difference between correct torque and feel is enough to change parallelism and running force.
What running force is acceptable after installation?
Compare with the figure the supplier gives for that preload class, and check that the force is smooth, similar in both directions, with no local peak at the joint.
07Where to go next
The tolerance the installation has to reach comes from the grade: accuracy grades and preload. Long rails that arrive in sections are covered in rail joints, the surface the rail sits on in mounting surface flatness, and how the sequence changes when the rail is on a wall or hanging inverted in mounting orientation. If the axis is noisy after assembly, the noise page separates a joint click from a wiper rub before you take the rail apart. If the axis runs tight after assembly, friction and drive force shows how to separate alignment drag from bearing drag.
Rails with a metal end cap for harsh assembly areas: SE series. For high-precision stages where the bed has to be scraped: PG series.
Part of the MS Linear product selection library — the engineering notes behind our linear guideways, ball screws, modules, shafts and bearings. For the full range, browse the MS Linear catalogue or the selection library index.
This page covers the essentials. For the complete selection PDF, full part-number tables and a matched recommendation, contact MS Linear or email [email protected] — we will send the relevant selection PDF for your load case.
Buying Precision Motion Components from China
is Your Best Choice!
Factory-direct quality and worldwide shipping — standard parts leave the factory in 3–10 days, custom strokes and leads in 15–20 days (2–3 weeks). Send your drawing or the original part number and get a quotation within 24 hours.
Cookie preferences
Choose which categories this site may use. Necessary cookies cannot be switched off.