Load calculation

Moment load on a linear guideway: MR, MP and MY

Most sizing mistakes are not about weight. They are about where the weight sits. A block that carries 9 kN comfortably in the centre can be overloaded by the same 9 kN hanging 300 mm to one side, because the offset turns force into moment.

Roll · pitch · yaw Static safety factor fSM 7 min read

01A moment fails the rail before the load does

Every guideway datasheet quotes two different families of number. C0 is the static load rating: the force at which the raceway reaches permanent deformation. M0 is the static moment rating, quoted three times, once per axis. A design has to clear both, and they are checked with two separate safety factors.

In practice the moment check is the one that fails. Machines rarely put a load straight down the middle of four blocks. The centre of gravity sits forward of the carriage, above the rail plane, or to one side of a single rail, and each of those offsets multiplies the force by a lever arm.

Rule of thumb. Below about 150 mm of offset on a 25-class rail, force usually governs. Above 300 mm, calculate the moment first: it will decide the size, the rail spacing and sometimes the whole machine layout.

02Three moments, three failure paths

The three directions are defined by the machine axis, not by the load direction. Each has a different cause and shows up differently on the machine:

MomentCaused byFirst symptom
MR roll, about travel axisA centre of gravity offset to the side of the rail line, or a side-mounted head. One rail pair carries more than the other.One rail runs hot and its wipers wear faster; the table tilts as it crosses the working area.
MP pitch, about lateral axisWeight forward of the block line, a long tool overhang, or acceleration acting at the centre of gravity height.Position error that grows towards the ends of travel; the far end of a gantry sags under load.
MY yaw, about vertical axisSingle-rail axes, offset drive force, or a head mounted off-centre. The block is twisted in plan view.Chatter when the axis reverses, and a step in the surface finish at the start of a cut.

All three are compared against their own M0 value. A rail that is generous in MR can be weak in MY, which is why the datasheet prints three numbers rather than one.

03The overhang formula, and the factor that goes with it

One equation covers the offset cases. The lever arm is measured from the line of the blocks to the line of action of the force, including any travel-end overhang:

Moment M = F × l
Safety fSM = M0 / M
Target fSM ≥ 1.0–3.0 normal duty

fSM ≥ 3.0–5.0 shock, press feed, interrupted cut

The same scale applies to the force check with fSL = C0 / P. Treat the two checks as parallel gates: the axis must pass both, and the lower result sets the size.

DutyMinimum fSM
Smooth transfer, no reversal shock1.0–1.5
General machinery, occasional reversal1.5–2.5
Cutting, pressing, shock or vibration3.0–5.0

When the moment is the governing check, the output you need from the datasheet is not C but the M0 row for the block type you intend to mount. Block length matters here: a long block carries roughly the same C as a short one but a noticeably higher M0, because the rolling elements sit further apart.

04A 900 kg gantry, worked through

Take a two-rail gantry with four blocks: moving mass 900 kg, rail spacing c = 1.2 m, block spacing d = 0.8 m, centre of gravity 0.30 m to one side of the rail centreline and 0.45 m above the rail plane. Acceleration is 0.5 m/s².

The weight alone gives 8.83 kN, or 2.21 kN per block. That number passes almost any 25-class rail. Now add the offsets:

ComponentResult
Roll moment from lateral offset
M = W × e = 8.83 × 0.30
2.65 kNm, the governing number on this axis
Extra load on the outer blocks
M / (2c) = 2.65 / 2.4
1.10 kN, so the worst block carries 3.31 kN instead of 2.21 kN
Pitch moment from acceleration
M = (m × a) × h = 0.45 × 0.45
0.20 kNm, small compared with the roll term
Yaw from an offset drive
M = 0.45 × 0.50
0.22 kNm, unless the drive sits far off-centre

The design does not need a rail that carries 8.83 kN. It needs a block whose MR is at least 1.5 × 2.65 = 3.98 kNm for normal duty, and whose C0 covers 3.31 kN with the same factor. Those are different parts of the datasheet, and the moment line is what pushes the size up.

What changes the answer. Lowering the centre of gravity from 0.30 m to 0.20 m cuts the roll moment by a third, to 1.77 kNm. Widening the rail spacing from 1.2 m to 1.6 m leaves the moment unchanged but drops the worst block load to 3.04 kN. Both are cheaper than the next size up.

05Four ways to cut the moment, ranked by cost

  • Widen the rail spacing c. The cheapest structural change and the most effective for roll: the reaction is inversely proportional to the spacing. It costs bed width, not rail size.
  • Lengthen the block spacing d. Works on pitch and yaw, and is limited by stroke length and the size of the moving table.
  • Lower the centre of gravity. Moving the motor, gearbox or counterweight below the rail plane can remove a third of the moment without touching the guideway.
  • Add blocks or go up a size. The last resort: it raises cost, mass and often the height of the centre of gravity, which feeds the very moment you are trying to reduce.

There is a fifth option that is not a structural change: use a wide-rail or anti-torque block where a single rail has to resist twist. The WE wide-rail series and the CG anti-torque block exist for exactly this case, and they are usually cheaper than redesigning the frame for two rails.

06What to send with the inquiry

A moment problem cannot be quoted from a load figure alone. Four numbers decide the part:

Mass moving mass, kg
Geometry rail spacing c, block spacing d, mm
Offsets CG height h and lateral offset e, mm
Duty acceleration, shock, reversal per cycle

With those four, the worst block load and the governing moment can be calculated before a size is quoted. If the layout is still moving, send a sketch with the rail line and the centre of gravity marked; that is enough to see which moment will govern.

07Questions we get

Does a bigger guideway size fix every moment problem?

It raises M0, but it also raises the block height and moves the centre of gravity up, which can increase the moment you started with. Widening the rail spacing usually cuts the moment more per euro.

Which moment is most likely to be exceeded on a single-rail axis?

Roll about the travel axis. A single rail cannot spread a side load across a pair, so any offset in the centre of gravity turns straight into roll on one block row.

Does preload increase the moment capacity?

Preload raises stiffness, not the static rating. It reduces deflection under the moment and removes the dead band on reversal, but M0 stays the same.

Can I compare a moment to C0 directly?

No. C0 is a force rating and M0 is a moment rating, quoted separately for MR, MP and MY, and checked with two different safety factors.

08Where to go next

The size calculator already takes rail spacing, block spacing and centre-of-gravity height, and returns the load per block. Use this page to read the moment result, then check it against the M0 row of the datasheet. The selection guide covers the rest of the sizing sequence, mounting orientation shows which moment dominates once the rail leaves the horizontal plane, and ball vs roller explains why a roller block carries more moment for the same envelope.

Heavy gantries and cutting heads: HG series, RG roller series. Single-rail layouts: WE wide rail.

Part of the MS Linear product selection library — the engineering notes behind our linear guideways, ball screws, modules, shafts and bearings. For the full range, browse the MS Linear catalogue or the selection library index.

This page covers the essentials. For the complete selection PDF, full part-number tables and a matched recommendation, contact MS Linear or email [email protected] — we will send the relevant selection PDF for your load case.

China Factory Direct · Drop-in Compatible Dimensions

Buying Precision Motion Components from China
is Your Best Choice!

Factory-direct quality and worldwide shipping — standard parts leave the factory in 3–10 days, custom strokes and leads in 15–20 days (2–3 weeks). Send your drawing or the original part number and get a quotation within 24 hours.

Drop-in Replacement Factory-Direct Price Global Shipping OEM / Non-Standard Bulk Discounts