Nomenclature

How to read a ball screw part number

A ball screw code is not a stock number. It is a specification compressed into one line: thread direction, diameter, lead, circuit, flange, length, accuracy, grinding method and preload. Read it left to right and the quotation stops being a guessing game.

2R25-25A2-2-FSED Nine segments 6 min read

01Why one line carries nine decisions

Two screws with the same diameter and lead can differ in axial play, noise, life and price by a factor of two, because the code also carries the circuit, the preload and the accuracy. Suppliers quote from the code, so an incomplete code gets a default answer, and the default is rarely what the machine needed.

Take a real example and read it in order:

Code 2R25-25A2-2-FSED-2000-2500-0.05-R-P2
Read 2 start, right hand · 25 mm · 25 mm lead · A2 circuit · 2 nuts · F flange, S single cut, E circuit, D double cut · 2000 thread · 2500 overall · 0.05 spec · R rolled · P2 preload

02Segment by segment

SegmentMeaningWhat it changes on the machine
2R / LStarts and thread direction: 2R two-start right, L left handTravel per turn, and which way the nut moves for a given motor direction
25Nominal shaft diameter, mmBuckling, critical speed and the support-unit size
25Lead, mm per turnSpeed against resolution: the same motor gives 25 mm per turn here
A2Circuit turns: T = 1, A = 1.8, B = 2.5, C = 3.5; digit after = number of return capsLoad capacity per nut and nut length; more turns means more balls in the load zone
2Number of nuts on the screwPreload arrangement and total nut length
F S DFlange type and cut: F flanged, S single cut, D double cutWhether the nut can sit against a face, and how it is keyed against rotation
2000 / 2500Threaded length / overall length, mmUsable stroke, end machining allowance and shipping length
R / GRolled or groundCost, lead error and the accuracy grade the screw can hold
P2Preload class P0 to P3Axial play, rigidity, friction and life

The trailing 0.05 is a specification figure whose meaning depends on the series: on some lines it is the axial play in millimetres, on others a lead-error band. Ask which one before comparing two quotations, because a 0.05 and a 0.02 look like small numbers and behave like different products.

03Circulation: the letters that decide noise and speed

The circuit letter describes how the balls return to the start of the load zone. It is the second biggest influence on noise after preload, and it limits speed before the screw itself does:

CodeTypeWhere it belongs
HExternal return tubeGeneral purpose, easy to service, common on SFU
UDIN 69051 profile, European standardDrop-in replacement for imported machines
IInternal recirculationCompact nut, higher speed, smaller loads
EHigh leadFast moves with a short screw, the trade is resolution
CHigh-silenceQuiet rooms, medical and lab equipment
YCylindrical keyway, small sizesShort strokes where a keyway replaces a flange
KMiniatureInstrument-scale screws below the standard range

The family prefix works the same way: SFU is the DIN-standard flanged type, SFI the internal-recirculation version, SFS the small-lead high-precision version, SFE the high-lead version, and FSY/FSB the cylindrical and small variants. Choose the family by the duty, then use the letter to fine-tune.

04Accuracy and preload are two different promises

GradeWhat it controlsTypical duty
C7Lead error over the thread lengthTransport, general automation, rolled screws
C5Tighter lead error, ground screwPositioning axes, dispensing, pick and place
C3Precision grade, ground and checkedMachine tools, measuring axes
PreloadAxial behaviourWhere it belongs
P0Clearance, no preloadManual axes, low-demand transfer
P1Micro clearanceGeneral positioning where a little play is acceptable
P2Light preloadThe default for servo positioning: no play, moderate friction
P3Heavy preloadMachine tools, high stiffness, higher torque and heat

Accuracy is about where the nut lands; preload is about how rigidly it sits there. A C7 screw can be supplied at P2, and a C3 screw at P0 — the two letters are independent, which is why both appear on the drawing.

05The support unit has to match the grade

The fixed-end support carries the axial load, and its bearing arrangement follows the screw grade. This is where a mixed specification shows up:

Screw gradeSupport-unit bearingAxial clearance
C7, EK05–EK08Deep groove ball bearingAbout 0.03 mm; light axial load only
C7, EK10–EK20Angular contact pair, not preloaded0.018 mm maximum
C5Angular contact pair, preloadedZero; the pair is set at the factory

So a C7 screw paired with a C5 support unit does not give a C5 axis, and a C5 screw with a C7 support unit has play at the bearing instead of at the nut. State both on the order, and state which end is fixed.

06Lengths, ends and the two numbers people confuse

The two length figures in the code are not interchangeable. The threaded length is what the nut can travel over; the overall length includes the end journals that carry the support units and the motor coupling. A screw quoted as 2000 / 2500 has 500 mm of end machining across both ends, which is generous, and is normal on a screw that needs a long motor journal and a lock nut on each side.

The usable stroke is the threaded length minus the nut length minus the end stops, and it must also clear the critical speed and buckling limits at the chosen lead.

07Six lines for the RFQ

1 Full code, including circuit and preload
2 Fixed end and supported end, and which direction is the motor
3 Stroke and duty cycle, not just overall length
4 Load and speed at the nut, plus the inertial mass
5 Accuracy grade with the measuring length
6 Environment: chips, coolant, washdown, temperature

Send the drawing of the end journals if the machine already exists. A code without journal dimensions can be matched on diameter and lead but not on fit, and the fit is what makes a replacement screw work.

08Questions we get

What does the letter before the diameter mean?

It describes the thread: 2R is two-start right hand, L is left hand. A two-start screw moves twice the lead per turn for the same shaft, which is how a high-lead screw is built without a coarse single thread.

Is a higher preload always better?

No. Preload removes play and raises rigidity, but it raises friction, heat and torque and shortens life. P2 covers most positioning axes; P3 belongs on machine tools that need stiffness.

Can I change the accuracy grade without changing the screw?

Usually not. The grade is ground into the screw and matched by the nut and the support bearings. The weakest link sets the result of the axis.

09Where to go next

All twenty guides are on the knowledge hub. For the axis that carries the screw, linear module selection covers stroke, speed and grade together; support seats explains the fixed and supported end in detail.

Ball screw products: ball screw category. For sizing arithmetic, the load and life calculator takes the numbers, and the guideway FAQ covers the questions that are not about a screw. Send the code and the end-journal drawing, and we will confirm the grade, the preload and the support-unit pairing before quoting.

Part of the MS Linear product selection library — the engineering notes behind our linear guideways, ball screws, modules, shafts and bearings. For the full range, browse the MS Linear catalogue or the selection library index.

This page covers the essentials. For the complete selection PDF, full part-number tables and a matched recommendation, contact MS Linear or email [email protected] — we will send the relevant selection PDF for your load case.

China Factory Direct · Drop-in Compatible Dimensions

Buying Precision Motion Components from China
is Your Best Choice!

Factory-direct quality and worldwide shipping — standard parts leave the factory in 3–10 days, custom strokes and leads in 15–20 days (2–3 weeks). Send your drawing or the original part number and get a quotation within 24 hours.

Drop-in Replacement Factory-Direct Price Global Shipping OEM / Non-Standard Bulk Discounts