How an order runs: from drawing review to export delivery

Most first enquiries stall on the same three questions: what happens after I send this, when do I get a price, and who checks the parts before they ship. This page answers them in order, and lists what to put in the first message so the quote comes back right the first time.

Seven steps Quote in 24 hours 5 min read

01What the quotation fixes

A quotation is not only a price. Four things get locked at that point, and changing any of them later restarts the schedule: the specification as drawn, the lead time, the packing method, and the shipping term.

Stated on the quoteWhy it matters later
SpecificationRail width, block height, accuracy grade and preload define what is built. A change after production starts is a new order, not a revision.
Lead timeStandard items and custom lengths run on different schedules, so the date on the quote is the one that holds.
Packing methodAnti-rust treatment and protective packing are chosen by part type and route, not by preference.
Shipping termThe term decides where your cost ends and the freight begins, which is the difference between two quotes that look far apart.

Read the quote as a specification document, not as a price tag. If any of the four is missing or vague, ask before you approve it.

02The seven steps

1

Drawing or model number

Send a drawing, a 3D model or the original part number. Rail width, block height, accuracy grade and mounting are checked before anything is quoted.

2

Quotation

Returned within 24 hours on business days, with price, lead time, packing method and shipping terms written on it.

3

Confirmation

The drawing is signed off and production is scheduled against the confirmed specification.

4

Production

Standard items dispatch in 3 to 10 days. Custom strokes, leads and rail drilling are scheduled after drawing approval, typically 15 to 20 days (2–3 weeks).

5

Inspection

The finished batch is verified before dispatch, and inspection records are supplied on request.

6

Packing

Anti-rust treatment, protective packaging, and a parts list inside each shipment.

7

Delivery

Sea, air or express to your port or forwarder, with shipping documents and full tracking.

03What to send with the first message

Eight details decide whether a quote comes back in one round or three. None of them is optional if the part has to fit an existing machine.

DetailWhat it settles
Part number or drawingThe series and the block type. A photo alone cannot define the raceway.
Rail width and lengthThe size class and the end distance, which is cut to the ordered length.
Number of blocksWhether it is priced as a set or as separate rails and blocks.
Accuracy grade and preload codeThe pair matched together. These are marked on the block.
QuantityThe price tier and whether it is a stock item or a production run.
Application and loadWhether the size class is adequate, before anyone quotes the wrong part quickly.
Destination and shipping termThe freight basis, which changes the total far more than the unit price does.
Required dateWhether it can go standard or has to be scheduled as a custom run.

If the original designation is unfamiliar, the mapping is in the replacement cross-reference, and the dimensional checks that make a swap safe are listed there too.

04What slows a quote down

In practice the delay is rarely on our side. These five come up most:

What was sentWhat has to be asked back
A photo of a block, nothing elseRail width, block height and the marking on the block. The photo cannot show the raceway.
A part number with no accuracy or preload codeThe codes, which are usually stamped on the block or printed on the rail end.
Rail length without the machine it fitsThe end distance, because a rail cut to a nominal figure can miss the last hole.
Quantity without a destinationThe shipping term, because the freight basis is part of the price comparison.
A required date with no flexibility statedWhether a custom run is acceptable, since that decides the schedule.

05Packing, documents and inspection

Precision components are packed with anti-rust treatment and protective packaging. Every shipment carries a parts list and the shipping documents, and tracking is provided for the whole route.

The finished batch is verified before dispatch, and inspection records are supplied on request. Where the machine is regulated or the part is going into a validated process, ask for the records at the quotation stage rather than after delivery, so the paperwork and the parts arrive together.

The dimensional tolerances behind the specification are on the size chart, and what the grade codes mean is in accuracy and preload. If the question is whether an existing part can be replaced at all, start from the cross-reference before ordering.

06Questions we get

How long does a quotation take?

Within 24 hours on business days, once the drawing or part number is clear enough to price.

What is the minimum order quantity?

It depends on the model and specification. Standard products are available in small quantities; bulk orders move to preferential factory pricing. The exact figure is confirmed on the quotation.

What is the lead time for standard and custom parts?

Standard items dispatch in 3 to 10 days. Custom strokes, leads and rail drilling are scheduled after drawing approval, typically 15 to 20 days (2–3 weeks).

How are the parts packed?

Anti-rust treatment and protective packaging, with a parts list in each shipment and full tracking.

Can inspection records be supplied?

Yes, on request. The finished batch is verified before dispatch.

Which shipping terms are used?

Sea, air and express are all available, and the term is stated on the quotation along with the most cost-effective option for the destination.

07Where to go next

If the family is not fixed yet, series comparison narrows it before anyone quotes. If the question is whether a part number on an existing drawing can be replaced, the cross-reference carries the series map and the four dimensional checks. Sizing comes before ordering: the calculator returns load and life, and the selection guide sets the order of decisions.

Everything else is commercial, so send the drawing or the original part number through the inquiry form and the quotation comes back with the dates and terms on it.

Part of the MS Linear product selection library — the engineering notes behind our linear guideways, ball screws, modules, shafts and bearings. For the full range, browse the MS Linear catalogue or the selection library index.

This page covers the essentials. For the complete selection PDF, full part-number tables and a matched recommendation, contact MS Linear or email [email protected] — we will send the relevant selection PDF for your load case.

China Factory Direct · Drop-in Compatible Dimensions

Buying Precision Motion Components from China
is Your Best Choice!

Factory-direct quality and worldwide shipping — standard parts leave the factory in 3–10 days, custom strokes and leads in 15–20 days (2–3 weeks). Send your drawing or the original part number and get a quotation within 24 hours.

Drop-in Replacement Factory-Direct Price Global Shipping OEM / Non-Standard Bulk Discounts