01What actually changes at this scale
A 25 size block carries its load through a raceway that is wide compared with the part tolerances. A 9 size block does not. The same nominal load produces a much larger share of it as moment, because the distance between the load line and the rail centre is small and the carriage is short. Three consequences follow, and they drive every decision on this page:
- Moment arrives first. A load hung 30 mm off a 12 size carriage is already a serious overhang. Check MR, MP and MY before comparing C values.
- The frame competes with the rail. A 10 mm aluminium plate deflects more than a 9 size block. Stiffening the plate usually buys more accuracy than stepping up the rail.
- Fits are won or lost in millimetres. Dust sheets, shoulders, screw heads and wiper clearance all live in the same 2 to 3 mm band.
02Narrow or wide: TGN against TGW
Both families use the same gothic-arch four-point contact and a ball retainer, and both are made of stainless steel throughout, including the balls and retainers. The difference is the rail width relative to the carriage.
| Property | TGN, narrow | TGW, wide |
|---|---|---|
| Rail width | Narrower than the carriage footprint | Rail is wide, carriage sits inside the rail width |
| Moment capacity | Lower; needs a pair of rails for anything with overhang | Higher; designed for single-axis use |
| Mounting | Two rails must be made parallel | One rail, no parallelism error to control |
| Typical use | Two-rail gantries, cross slides, optical stages | Single-rail tables, cantilever pick heads, PCB handling |
The wide version exists precisely because a single track removes a tolerance stack: no rail-to-rail parallelism, no height matching between two blocks, and a shorter assembly. What it does not remove is the overhang moment, which now acts about the one track instead of being shared.
03Sizes, screws and what grows with each step
Four sizes are common: 7, 9, 12 and 15, in both narrow and wide form. The step from 7 to 15 roughly doubles the rail width and the block length, and it changes the mounting screw, which is the practical limit on how much load the joint can take before the bolts are the weak point.
| Size | Rail screw | Tightening torque | Practical note |
|---|---|---|---|
| 7 | M2 | 5.9 kgf·cm ≈ 0.58 N·m | Torque driver mandatory; a hand hex key strips the thread |
| 9 | M3 | 19 kgf·cm ≈ 1.86 N·m | Most common miniature size for two-rail stages |
| 12 | M3 (TGN) / M4 (TGW) | 19 / 40 kgf·cm | Wide version jumps to M4; check the bolt head clearance |
| 15 | M3 (TGN) / M4 (TGW) | 19 / 40 kgf·cm | Top of the miniature range; above this the standard families start |
These are the catalogue torque values for the rail screws, and they are low by the standards of a machine shop. Tightening a size 7 rail by feel is the single most common way to ruin one: the thread pulls, the rail bows between bolts and the carriage runs tight at the middle of the stroke.
04Load and moment check, in the right order
Take the carriage weight and the payload first, then place the centre of mass. For a single wide rail the check is:
Pitch MP = F × l, l = distance from rail centre to the load line
Yaw MY = F × k, k = lateral offset of the same load
Roll MR = W × h, h = height of the centre of mass above the rail
Then compare each moment with the static permissible moment of the size you picked, not with the C value of the block. On a 9 size single rail, a 200 g pick head on a 40 mm cantilever can use up the pitch allowance long before the vertical load becomes interesting. When that happens the fix is not a bigger rail: it is a shorter cantilever, a lower centre of mass, or a second block on the same rail to lengthen the moment base.
For a two-rail stage, the same arithmetic applies with the rail spacing c dividing the roll moment between the two tracks. Keep c as wide as the table allows: doubling the spacing halves the load per block from roll.
05Stainless, dust sheets and the clearance nobody checks
Miniature rails are stainless throughout, so corrosion is not the design driver. Contamination is. A dust sheet can be added to the underside of the carriage on sizes 9, 12 and 15; on size 7 the gap between the carriage and the bottom abutment is too small to fit one, and the catalogue does not offer it.
Where a dust sheet is used, the clearance H between the carriage and the mounting surface drops. Two rules follow:
- A side abutment shoulder must be lower than H, or the carriage will rub it through the stroke.
- The shoulder height and chamfer radius in the drawing must match the size table; a 0.2 mm chamfer is normal at this scale, 1 mm is a groove.
If the application is clean and dry, skip the sheet and keep the clearance. If it is not, fit the sheet and re-check the shoulder, rather than fitting it and discovering the interference on the bench.
06Rail length, end distance and stroke
Standard lengths are stocked; anything else is cut to order. When ordering a non-standard length, keep the end-face distance E below half the bolt pitch P, and above the minimum that avoids cracking the end bolt hole. Too large an E leaves the rail end unsupported and it will not sit flat; too small an E cracks the hole during tightening.
The usable stroke is the rail length minus the carriage length minus two end stops. On a 200 mm rail with a 30 mm carriage and 5 mm stops each side, the travel is 160 mm, not 200. Small axes lose a larger fraction of their rail to the block than big ones do, which is why miniature stages are often specified by stroke first and rail length second.
07Where these rails are actually used
- Semiconductor and PCB handling. Short stroke, high repeatability, clean environment; a 9 or 12 wide rail with H grade is the usual fit.
- Medical and laboratory instruments. Stainless matters, loads are small, and the moment from an offset probe dominates the calculation.
- Small robot arms and end effectors. Cantilever loads; wide rail, two blocks, short overhang.
- Optical and measuring stages. Accuracy and preload matter more than capacity; a light preload gives smoother stick-slip behaviour at low speed.
In all four, the rail is chosen after the frame and the drive, not before. Decide the plate thickness, the screw and the bearing arrangement, then pick the rail that fits the space that is left.
08Questions we get
Is a size 7 guideway a bearing or a slide?
It is a real rolling guideway with a four-point contact and a ball retainer, but the mount, the screw and the frame deflect more than the block does. Treat the rail as one part of a small structure.
One wide rail or two narrow rails?
Below 15 size, one wide rail is usually the better answer: no parallelism stack, lower carriage, useful moment capacity from one track. Two rails win only when the table is wider than the rail is long.
Why stainless throughout?
The parts are thin and cannot afford a rust allowance, and the equipment these rails go into is often medical, semiconductor or washdown. All metal parts, balls and retainers included, are stainless.
09Where to go next
All twenty guides, arranged by decision stage, are on the knowledge hub.
This page covers the format. The load arithmetic is on moment load, the grade and preload pairing is on accuracy and preload, and the assembly sequence that keeps a small rail straight is on installation. If the axis is clean-room, read stainless guideways before fixing the material.
Miniature products: MG series and QE low-profile for the sizes above 15. Send the stroke, the moving mass and the overhang, and we will return the size and the block count.
Part of the MS Linear product selection library — the engineering notes behind our linear guideways, ball screws, modules, shafts and bearings. For the full range, browse the MS Linear catalogue or the selection library index.
This page covers the essentials. For the complete selection PDF, full part-number tables and a matched recommendation, contact MS Linear or email [email protected] — we will send the relevant selection PDF for your load case.
Buying Precision Motion Components from China
is Your Best Choice!
Factory-direct quality and worldwide shipping — standard parts leave the factory in 3–10 days, custom strokes and leads in 15–20 days (2–3 weeks). Send your drawing or the original part number and get a quotation within 24 hours.
Cookie preferences
Choose which categories this site may use. Necessary cookies cannot be switched off.
